Some of Our Most Recent Projects
![ESI](http://www.acesind.com/wp-content/uploads/2021/08/ESI.jpg)
ESI Medical College, Gulbarga
The campus is spread over 75 acres and provides primary and tertiary healthcare facilities to the workers insured under the ESI corporation as well as non-insured persons and is one of the tertiary care referral centers for smaller ESI clinic and dispensaries.
The Construction has started in 2011 & finished in 2013 Where - the work done was mentioned in OUR Success
Contract received from NCC Ltd.
![LODHA](http://www.acesind.com/wp-content/uploads/2021/08/LODHA.jpg)
Lodha Bellezza Meridain
Hyderabad Its a high Rise Residential Project from 2009 to 2019. Our work done from 2013 to 2019
Contract received from Lodha Group
![S Kota](http://www.acesind.com/wp-content/uploads/2021/08/S-Kota.jpg)
SHAR - ISRO, Sri Hari Kota
Work done: 10500 Holes - 28 days From April 3rd to April 30th 2016
Contract received from NCC Ltd.
![vedanta](http://www.acesind.com/wp-content/uploads/2021/08/vedanta.jpg)
Vedanta Aluminium Limited
Shutdown activity for 14 days in May 2019 & Nov 2019 Work Description: ID Fan Foundation Strengthening Activity, which includes Wire Sawing & Anchoring
Contract received from Power Mech Ltd.
![Phoenix](http://www.acesind.com/wp-content/uploads/2021/08/Phoenix.jpg)
Phoenix Aquila
Shutdown activity for 14 days in May 2019 & Nov 2019 Work Description: ID Fan Foundation Strengthening Activity, which includes Wire Sawing & Anchoring
Contract received from Power Mech Ltd.